Poster | Thread |
terminills
|  |
Re: A-EON Rev 2 "Nemo" Update Posted on 22-Jul-2010 13:03:33
| | [ #21 ] |
|
|
 |
AROS Core Developer  |
Joined: 8-Mar-2003 Posts: 1472
From: Unknown | | |
|
| @BigD
I had to use a english to ebonics translator(I'm not from California we don't have any Ebonics courses here.). It was more the point of people making a big deal over the differences between UK English and US English.
P.S. I mangle the english language fine without the help of ebonics anyway.
Tim  Last edited by terminills on 22-Jul-2010 at 01:21 PM. Last edited by terminills on 22-Jul-2010 at 01:05 PM.
_________________ Support AROS sponsor a developer.
"AROS is prolly illegal ~ Evert Carton" intentionally quoted out of context for dramatic effect
|
|
Status: Offline |
|
|
-Sam-
 |  |
Re: A-EON Rev 2 "Nemo" Update Posted on 22-Jul-2010 19:55:27
| | [ #22 ] |
|
|
 |
Elite Member  |
Joined: 18-Apr-2003 Posts: 3034
From: Yorkshire Dales, United Knigdom | | |
|
| Quote:
All in all, logic dictates that "program" is a lot more favorable than any other made-up alternative. |
Or you could just have said - 'sorry I was wrong as I didn't notice that it was the correct English spelling which is where the post originated from'.
It would have saved you 'bandwidth'. _________________ Sam
|
|
Status: Offline |
|
|
Stephen_Robinson
|  |
Re: A-EON Rev 2 "Nemo" Update Posted on 22-Jul-2010 20:59:19
| | [ #23 ] |
|
|
 |
Super Member  |
Joined: 29-Apr-2005 Posts: 1991
From: UK | | |
|
| Er.. So has anyone got anything either intresting or at the very least, on subject about this intresing news?
Cus,I ain't got nothing... _________________ Rage quited 29th May 2011
|
|
Status: Offline |
|
|
Trev
|  |
Re: A-EON Rev 2 "Nemo" Update Posted on 22-Jul-2010 23:06:19
| | [ #24 ] |
|
|
 |
Cult Member  |
Joined: 24-Jul-2005 Posts: 778
From: Sacramento, CA, USA | | |
|
| @ShadowSun
Is "disc" used universally in British English? Personally, I use disk when referring to magnetic media and disc when referring to optical media.
Re: English orthography, I work for a British firm. All official correspondence is written in British English; however, employees use native or local variations for all informal communication. Still, quite a bit of localization takes place when a business unit is located in a single region. _________________ Sam440ep-flex 733 MHz/1 GB RAM/Radeon 9250/AmigaOS4.1 Update 2 borked A1200/Blizzard1260+SCSI-IV/Z4+MediatorZIV/Deneb/Voodoo3/CatweaselMk3 more borked A1200/MBX1200z/Indivision A500/clockport/RRNet A600/A603
|
|
Status: Offline |
|
|
tiffers
|  |
Re: A-EON Rev 2 "Nemo" Update Posted on 23-Jul-2010 1:06:06
| | [ #25 ] |
|
|
 |
Regular Member  |
Joined: 7-Jun-2007 Posts: 349
From: Perth, Western Australia | | |
|
| http://www.a-eon.com/pics/AmigaOne_X1000_BetaTester1.jpg
Is this now using an active cooling solution? Or is this a solid core with small fins?
Is the mailing list working for everyone else? I haven't gotten an email since the AmigaKit announcement. I have just 'signed up' with the same email address. It didn't tell me I was already registered. |
|
Status: Offline |
|
|
mr_homm
|  |
Re: A-EON Rev 2 "Nemo" Update Posted on 23-Jul-2010 1:53:46
| | [ #26 ] |
|
|
 |
Regular Member  |
Joined: 21-Mar-2003 Posts: 180
From: Seattle | | |
|
| Well, this all explains the improvements to the Xena module: by revising the board traces to adopt American spelling, two bytes were saved, freeing up 16 traces which were used to increase the overall connectivity. Or not. |
|
Status: Offline |
|
|
umisef
|  |
Re: A-EON Rev 2 "Nemo" Update Posted on 23-Jul-2010 5:12:29
| | [ #27 ] |
|
|
 |
Super Member  |
Joined: 19-Jun-2005 Posts: 1704
From: Melbourne, Australia | | |
|
| Quote:
And I'm the only one interested in what's the new dip-swich block is there for?
|
Probably, because that dip switch block isn't new :) In fact, this photo looks exactly like the board shown at VCF --- which isn't such a big surprise, seeing as the rev2 design has been finished, but nobody said anything about actually having produced a rev2 board.
(And on a rev2 board, I'd expect to see the pads for the lane switches, which are visible in the background, populated. Without them, the second PCIe-16x slot is going to be rather useless; Not sure about the first one...)Last edited by umisef on 23-Jul-2010 at 05:13 AM.
|
|
Status: Offline |
|
|
ShadowSun
|  |
Re: A-EON Rev 2 "Nemo" Update Posted on 23-Jul-2010 6:20:33
| | [ #28 ] |
|
|
 |
Member  |
Joined: 26-Feb-2009 Posts: 77
From: Unknown | | |
|
| |
Status: Offline |
|
|
Swoop
 |  |
Re: A-EON Rev 2 "Nemo" Update Posted on 23-Jul-2010 10:17:31
| | [ #29 ] |
|
|
 |
Elite Member  |
Joined: 20-Jun-2003 Posts: 2159
From: Long Riston, East Yorkshire | | |
|
| @Umisef
Quote:
In fact, this photo looks exactly like the board shown at VCF --- which isn't such a big surprise, seeing as the rev2 design has been finished, but nobody said anything about actually having produced a rev2 board. |
Trevor mentioned it in his speech, and referred to it several times. _________________ Peter Swallow. A1XEG3-800 [IBM 750FX PowerPC], running OS4.1FE, using ac97 onboard sound.
"There are 10 types of people in the world: those who understand binary, and those who don't."
|
|
Status: Offline |
|
|
umisef
|  |
Re: A-EON Rev 2 "Nemo" Update Posted on 23-Jul-2010 11:27:56
| | [ #30 ] |
|
|
 |
Super Member  |
Joined: 19-Jun-2005 Posts: 1704
From: Melbourne, Australia | | |
|
| Quote:
Trevor mentioned it in his speech, and referred to it several times.
|
Listening to the VCF speech again, he mentions "we are going to wait for those to come in" with respect to rev2 boards. To me that says pretty clearly that no boards had been produced at that point, and seeing as the very news item we are discussing still talks about having a design, but not about having a production run, I see no indication that there has been a production run yet.Last edited by umisef on 23-Jul-2010 at 11:47 AM.
|
|
Status: Offline |
|
|
vidarh
 |  |
Re: A-EON Rev 2 "Nemo" Update Posted on 23-Jul-2010 14:59:35
| | [ #31 ] |
|
|
 |
Cult Member  |
Joined: 4-Jan-2010 Posts: 580
From: London, UK (ex-pat; originally from Norway) | | |
|
| Quote:
Listening to the VCF speech again, he mentions "we are going to wait for those to come in" with respect to rev2 boards. To me that says pretty clearly that no boards had been produced at that point, and seeing as the very news item we are discussing still talks about having a design, but not about having a production run, I see no indication that there has been a production run yet. |
In fact, Trevor posted on Amiga.org to correct a news item, stating that the boards being shown in Essen are rev. 1, so you're probably correct. _________________ Wiki for new/returning Amiga users - Projects: ACE basic compiler / FrexxEd / Git
|
|
Status: Offline |
|
|
Canfod
|  |
Re: A-EON Rev 2 "Nemo" Update Posted on 23-Jul-2010 17:21:27
| | [ #32 ] |
|
|
 |
Regular Member  |
Joined: 8-Nov-2005 Posts: 138
From: The WET coast of Canada | | |
|
| Quote:
@tonyw Don't forget Canada. Colour is the correct spelling... ahem. |
Yes, and as a fellow Canadian, that was taught the British English way of spelling various words, I agree with colour vs. color, humour vs. humor, favour vs. favor, etc., etc., BUT all my teachers must have decided to skip "programme", because I've NEVER personally used it spelled any way other than "program".  |
|
Status: Offline |
|
|
RodTerl
|  |
Re: A-EON Rev 2 "Nemo" Update Posted on 24-Jul-2010 12:57:00
| | [ #33 ] |
|
|
 |
Cult Member  |
Joined: 6-Sep-2004 Posts: 589
From: Rossendale | | |
|
| Um, but I said when I loooked at the display Mobo in its acrylic case, Oh look, rev 2.
And its said you dont buy stull till Rev 3. Well, Hyperion got Rev 1 to get teh OS working, Betas are getting Rev 2 to bug fix software and hardware and offer possible minimum alterations, improvements.
Rev 3 goes on sale. And I hope they hit the Christmas deadline, bcause in the UK at least, with what the Gov is doing, Its a Deadline.
VAT=15% VAT=17.5% VAT=15% VAT=17.5% VAT=20%
Oh boy, am I glad I wrote the code with VAT as a variable so I didnt have to recompile each time. _________________ The older and more respected a scientist is, the longer it takes to prove him wrong.
|
|
Status: Offline |
|
|
zErec
|  |
Re: A-EON Rev 2 "Nemo" Update Posted on 24-Jul-2010 20:27:21
| | [ #34 ] |
|
|
 |
Cult Member  |
Joined: 17-Dec-2003 Posts: 514
From: Germany | | |
|
| @thread
Hi guys,
I just returned from the Event in Essen / Germany.
It was big fun !!!
I talked to the A-EON people.
They mentioned that the REV.2 Board is the one for the beta-testers and customers too.
It´s design has been finished but the have to do a first production run of five boards. If these boards are 100% then the go into mass-production.
One unique new info:
The X-MOS chip on the REV.2 Board is going to be DUAL-CORE.
I got the information from Trevor himself.
greetz z!Erec Last edited by zErec on 26-Jul-2010 at 06:15 AM.
_________________ - AmigaX1Ooo with OS4.1FE // CD32/SX32Pro/SX1/CD32Shuttle - A600-Vampire600 FPGA // A4KT/CSPPC233,144MB,PCI, AOS4.1.6FE - MACmini 1.5GHz // Pegasos 2 1GHz // Efika - ATARI Falcon/060/SuperVidel // ATARI Falcon MK X
|
|
Status: Offline |
|
|